Details

Reactor Type Pressurised Water Reactor (or PWR)
Model ACPR-1000
Owner Jiangsu Nuclear Power Corporation
Operator Jiangsu Nuclear Power Corporation

Timeline

Construction Start Wednesday, 7 September 2016
First Criticality Tuesday, 4 May 2021
First Grid Connection Tuesday, 11 May 2021
Commercial Operation Wednesday, 2 June 2021

Specifications

Capacity Net 1060 MWe
Capacity Gross 1118 MWe
Thermal Capacity 2905 MWt
Design Net Capacity 1000 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2021 1060 5636 5786.59 100.00 98.90 98.90 96.50 96.50
2022 1060 7643 7538.05 87.20 86.80 91.30 81.20 86.80

Source: Operating details - IAEA PRIS