Timeline

Construction Start Sunday, 27 December 2015
First Criticality Monday, 27 July 2020
First Grid Connection Saturday, 8 August 2020
Commercial Operation Tuesday, 8 September 2020

Specifications

Capacity Net 1060 MWe
Capacity Gross 1118 MWe
Thermal Capacity 2905 MWt
Design Net Capacity 1000 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2020 1000 3383 2901.91 95.90 93.30 93.30 91.30 91.30
2021 1060 7400 7538.34 84.50 84.40 86.50 81.20 83.60
2022 1060 8760 8933.22 100.00 98.40 91.60 96.20 89.00

Source: Operating details - IAEA PRIS