Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | ACPR-1000 |
Owner | Jiangsu Nuclear Power Corporation |
Operator | Jiangsu Nuclear Power Corporation |
Timeline
Construction Start | Sunday, 27 December 2015 |
---|---|
First Criticality | Monday, 27 July 2020 |
First Grid Connection | Saturday, 8 August 2020 |
Commercial Operation | Tuesday, 8 September 2020 |
Specifications
Capacity Net | 1060 MWe |
---|---|
Capacity Gross | 1118 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2020 | 1000 | 3383 | 2901.91 | 95.90 | 93.30 | 93.30 | 91.30 | 91.30 |
2021 | 1060 | 7400 | 7538.34 | 84.50 | 84.40 | 86.50 | 81.20 | 83.60 |
2022 | 1060 | 8760 | 8933.22 | 100.00 | 98.40 | 91.60 | 96.20 | 89.00 |