Details

Reactor Type Pressurized Heavy Water Reactor (or PHWR)
Model Horizontal Pressure Tube Type
Owner Nuclear Power Corporation Of India Ltd
Operator Nuclear Power Corporation Of India Ltd

Timeline

Construction Start Wednesday, 8 March 2000
First Criticality Sunday, 6 March 2005
First Grid Connection Saturday, 4 June 2005
Commercial Operation Monday, 12 September 2005

Specifications

Capacity Net 490 MWe
Capacity Gross 540 MWe
Thermal Capacity 1730 MWt
Design Net Capacity 502 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2005 490 2770 990.44 76.00 73.80 73.80 65.70 65.70
2006 490 5454 1762.12 62.30 39.00 47.70 41.00 47.20
2007 490 6797 2032.97 77.60 54.40 50.60 47.40 47.30
2008 490 8022 1709.82 91.30 47.40 49.60 39.70 45.00
2009 490 8187 2229.28 93.50 60.00 52.00 51.90 46.60
2010 490 7526 2571.83 85.90 59.90 53.50 59.90 49.10
2011 490 6568 2518.86 75.00 58.80 54.30 58.70 50.60
2012 490 8440 3402.67 96.10 79.10 57.70 79.10 54.50
2013 490 7779 3530.42 88.80 82.20 60.60 82.20 57.80
2014 490 8409 3722.25 96.00 86.70 63.40 86.70 60.90
2015 490 7881 3762.17 90.00 87.80 65.80 87.60 63.50
2016 490 8381 4027.88 95.40 93.60 68.20 93.60 66.20
2017 490 3951 1876.84 45.10 44.70 66.30 43.70 64.40
2018 490 7494 3687.88 85.60 85.30 67.80 85.90 66.00
2019 490 8717 4308.00 99.50 99.40 70.00 100.40 68.40
2020 490 8280 4088.13 94.30 94.00 71.50 95.00 70.10
2021 490 6806 3358.57 77.70 77.20 71.90 78.20 70.60
2022 490 8364 4133.62 95.50 95.40 73.20 96.30 72.10

Source: Operating details - IAEA PRIS


See Also

Nuclear Power in India

Related News

WNN articles on India
Subscribe to receive updates on news