Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | EPR-1750 |
Owner | Guangdong Taishan Nuclear Power Joint Venture Co Ltd |
Operator | Guangdong Taishan Nuclear Power Joint Venture Co Ltd |
Timeline
Construction Start | Wednesday, 18 November 2009 |
---|---|
First Criticality | Wednesday, 6 June 2018 |
First Grid Connection | Friday, 29 June 2018 |
Commercial Operation | Thursday, 13 December 2018 |
Specifications
Capacity Net | 1660 MWe |
---|---|
Capacity Gross | 1750 MWe |
Thermal Capacity | 4590 MWt |
Design Net Capacity | 1660 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2018 | 1660 | 3958 | 3056.09 | 100.00 | 84.50 | 84.50 | 83.50 | 83.50 |
2019 | 1660 | 7836 | 11952.73 | 89.40 | 90.80 | 90.30 | 82.20 | 82.30 |
2020 | 1660 | 6377 | 9169.83 | 72.60 | 70.50 | 80.80 | 62.90 | 73.00 |
2021 | 1660 | 4933 | 7616.68 | 56.30 | 55.10 | 72.50 | 52.40 | 66.30 |
2022 | 1660 | 3322 | 4113.09 | 37.90 | 28.30 | 61.70 | 28.30 | 57.00 |