Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | OPR-1000 |
Owner | Korea Hydro And Nuclear Power Co. |
Operator | Korea Hydro And Nuclear Power Co. |
Timeline
Construction Start | Tuesday, 20 November 2007 |
---|---|
First Criticality | Friday, 6 January 2012 |
First Grid Connection | Friday, 27 January 2012 |
Commercial Operation | Tuesday, 31 July 2012 |
Specifications
Capacity Net | 997 MWe |
---|---|
Capacity Gross | 1048 MWe |
Thermal Capacity | 2825 MWt |
Design Net Capacity | 950 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2012 | 997 | 6256 | 4964.62 | 97.00 | 94.90 | 94.90 | 94.90 | 94.90 |
2013 | 991 | 3353 | 3295.84 | 38.30 | 37.90 | 54.80 | 38.00 | 54.80 |
2014 | 1000 | 8677 | 8611.78 | 99.00 | 98.30 | 72.90 | 98.30 | 72.90 |
2015 | 997 | 6354 | 6217.67 | 72.50 | 71.20 | 72.40 | 71.20 | 72.40 |
2016 | 997 | 7522 | 7393.37 | 85.60 | 84.40 | 75.10 | 84.40 | 75.10 |
2017 | 997 | 8640 | 8553.53 | 98.60 | 97.60 | 79.30 | 97.90 | 79.30 |
2018 | 997 | 7097 | 7002.14 | 81.00 | 80.10 | 79.40 | 80.20 | 79.50 |
2019 | 997 | 7511 | 7404.26 | 85.70 | 84.70 | 80.10 | 84.80 | 80.20 |
2020 | 997 | 8784 | 8751.10 | 100.00 | 99.90 | 82.50 | 99.90 | 82.50 |
2021 | 997 | 6788 | 6699.21 | 77.50 | 76.60 | 81.80 | 76.70 | 81.90 |
2022 | 997 | 7954 | 7892.31 | 90.80 | 90.30 | 82.60 | 90.40 | 82.70 |