Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | OPR-1000 |
Owner | Korea Hydro And Nuclear Power Co. |
Operator | Korea Hydro And Nuclear Power Co. |
Timeline
Construction Start | Tuesday, 5 June 2007 |
---|---|
First Criticality | Tuesday, 27 December 2011 |
First Grid Connection | Saturday, 28 January 2012 |
Commercial Operation | Friday, 20 July 2012 |
Specifications
Capacity Net | 996 MWe |
---|---|
Capacity Gross | 1047 MWe |
Thermal Capacity | 2825 MWt |
Design Net Capacity | 995 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2012 | 997 | 5897 | 5400.28 | 100.00 | 99.80 | 99.80 | 98.00 | 98.00 |
2013 | 1000 | 3569 | 3560.31 | 40.70 | 40.60 | 58.00 | 40.60 | 57.60 |
2014 | 998 | 8518 | 8304.89 | 97.20 | 96.00 | 73.70 | 95.00 | 73.00 |
2015 | 996 | 7604 | 7405.24 | 86.80 | 84.90 | 77.00 | 84.90 | 76.50 |
2016 | 997 | 6718 | 6627.86 | 76.50 | 75.70 | 76.70 | 75.70 | 76.30 |
2017 | 997 | 8760 | 8699.48 | 100.00 | 99.60 | 80.90 | 99.60 | 80.60 |
2018 | 996 | 7011 | 6847.68 | 80.00 | 78.50 | 80.50 | 78.50 | 80.30 |
2019 | 996 | 7014 | 6889.15 | 80.10 | 79.00 | 80.30 | 79.00 | 80.10 |
2020 | 996 | 8127 | 8062.54 | 92.50 | 92.10 | 81.70 | 92.20 | 81.50 |
2021 | 996 | 7443 | 7316.90 | 85.00 | 83.90 | 81.90 | 83.90 | 81.80 |
2022 | 996 | 7655 | 7518.95 | 87.40 | 86.20 | 82.40 | 86.20 | 82.20 |