Details
Reactor Type | High Temperature Gas-Cooled Reactor (or HTGR) |
---|---|
Model | HTR-PM |
Owner | China Huaneng Group |
Operator | Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd. |
Timeline
Construction Start | Sunday, 9 December 2012 |
---|---|
First Criticality | Sunday, 12 September 2021 |
First Grid Connection | Monday, 20 December 2021 |
Commercial Operation | Tuesday, 5 December 2023 |
Specifications
Capacity Net | 150 MWe |
---|---|
Capacity Gross | 211 MWe |
Thermal Capacity | 500 MWt |
Design Net Capacity | 200 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2021 | 200 | 432 | 86.40 | - | - | - | - | - |
2022 | - | - | - | - | - | - | - | - |