Details

Reactor Type Pressurised Water Reactor (or PWR)
Model AP1000
Owner Sanmen Nuclear Power Co., Ltd.
Operator Sanmen Nuclear Power Co., Ltd.

Timeline

Construction Start Sunday, 19 April 2009
First Criticality Thursday, 21 June 2018
First Grid Connection Saturday, 30 June 2018
Commercial Operation Friday, 21 September 2018

Specifications

Capacity Net 1157 MWe
Capacity Gross 1251 MWe
Thermal Capacity 3400 MWt
Design Net Capacity 1157 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2018 1157 3840 3330.63 100.00 99.80 99.80 99.40 99.40
2019 1157 7909 8987.29 90.30 91.10 92.90 88.70 90.80
2020 1157 7832 8757.82 89.20 87.30 90.40 86.20 88.80
2021 1157 8268 9379.74 94.40 92.90 91.20 92.60 89.90
2022 1157 7821 8805.20 89.30 88.40 90.50 86.90 89.20

Source: Operating details - IAEA PRIS