Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | AP1000 |
Owner | Sanmen Nuclear Power Co., Ltd. |
Operator | Sanmen Nuclear Power Co., Ltd. |
Timeline
Construction Start | Sunday, 19 April 2009 |
---|---|
First Criticality | Thursday, 21 June 2018 |
First Grid Connection | Saturday, 30 June 2018 |
Commercial Operation | Friday, 21 September 2018 |
Specifications
Capacity Net | 1157 MWe |
---|---|
Capacity Gross | 1251 MWe |
Thermal Capacity | 3400 MWt |
Design Net Capacity | 1157 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2018 | 1157 | 3840 | 3330.63 | 100.00 | 99.80 | 99.80 | 99.40 | 99.40 |
2019 | 1157 | 7909 | 8987.29 | 90.30 | 91.10 | 92.90 | 88.70 | 90.80 |
2020 | 1157 | 7832 | 8757.82 | 89.20 | 87.30 | 90.40 | 86.20 | 88.80 |
2021 | 1157 | 8268 | 9379.74 | 94.40 | 92.90 | 91.20 | 92.60 | 89.90 |
2022 | 1157 | 7821 | 8805.20 | 89.30 | 88.40 | 90.50 | 86.90 | 89.20 |