Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | VVER V-320 |
Owner | Joint Stock Company 'Concern Rosenergoatom' |
Operator | Joint Stock Company 'Concern Rosenergoatom' |
Timeline
Construction Start | Wednesday, 16 June 2010 |
---|---|
First Criticality | Friday, 29 December 2017 |
First Grid Connection | Friday, 2 February 2018 |
Commercial Operation | Friday, 28 September 2018 |
Specifications
Capacity Net | 979 MWe |
---|---|
Capacity Gross | 1030 MWe |
Thermal Capacity | 3000 MWt |
Design Net Capacity | 950 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2018 | 950 | 6556 | 5681.92 | 100.00 | 100.00 | 100.00 | 103.80 | 103.80 |
2019 | 979 | 7751 | 7430.57 | 88.50 | 87.00 | 89.60 | 86.60 | 90.00 |
2020 | 979 | 8573 | 8066.50 | 97.60 | 94.90 | 91.90 | 93.80 | 91.70 |
2021 | 979 | 7862 | 7521.96 | 89.80 | 88.00 | 90.70 | 87.70 | 90.50 |
2022 | 979 | 7761 | 7542.06 | 88.60 | 87.30 | 89.90 | 87.90 | 89.90 |