Details

Reactor Type Pressurized Heavy Water Reactor (or PHWR)
Model Horizontal Pressure Tube type
Owner Nuclear Power Corporation Of India Ltd
Operator Nuclear Power Corporation Of India Ltd

Timeline

Construction Start Monday, 20 January 2003
First Criticality Saturday, 23 January 2010
First Grid Connection Sunday, 28 March 2010
Commercial Operation Wednesday, 31 March 2010

Specifications

Capacity Net 202 MWe
Capacity Gross 220 MWe
Thermal Capacity 801 MWt
Design Net Capacity 202 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2010 202 3041 494.85 46.10 38.10 38.10 37.10 37.10
2011 202 7506 1570.55 85.70 85.80 65.30 88.80 66.60
2012 202 8317 1711.31 94.70 94.80 76.00 96.40 77.40
2013 202 7420 1533.21 84.70 84.90 78.40 86.60 79.90
2014 202 6514 1231.86 74.40 68.40 76.30 69.60 77.70
2015 202 7042 1333.69 80.40 76.90 76.40 75.40 77.30
2016 202 5921 1153.85 67.40 67.80 75.10 65.00 75.50
2017 202 7321 1436.62 83.60 83.70 76.20 81.20 76.20
2018 202 7489 1543.92 85.50 85.60 77.30 87.20 77.50
2019 202 8281 1711.86 94.50 94.60 79.10 96.70 79.50
2020 202 7680 1580.22 87.40 87.60 79.80 89.10 80.40
2021 202 7429 1519.08 84.80 84.70 80.30 85.80 80.80
2022 202 8513 1728.96 97.20 96.40 81.50 97.70 82.10

Source: Operating details - IAEA PRIS


See Also

Nuclear Power in India

Related News

WNN articles on India
Subscribe to receive updates on news