Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CNP-600 |
Owner | Nuclear Power Plant Qinshan Joint Venture Company Ltd. |
Operator | Cnnc Nuclear Operation Management Company Limited |
Timeline
Construction Start | Friday, 28 April 2006 |
---|---|
First Criticality | Tuesday, 13 July 2010 |
First Grid Connection | Sunday, 1 August 2010 |
Commercial Operation | Tuesday, 5 October 2010 |
Specifications
Capacity Net | 623 MWe |
---|---|
Capacity Gross | 660 MWe |
Thermal Capacity | 1930 MWt |
Design Net Capacity | 619 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2010 | 610 | 2685 | 1465.17 | 96.30 | 92.10 | 92.10 | 94.80 | 94.80 |
2011 | 610 | 7226 | 4434.13 | 82.50 | 81.60 | 84.20 | 83.00 | 85.70 |
2012 | 610 | 7977 | 4846.78 | 90.80 | 90.00 | 86.80 | 90.40 | 87.80 |
2013 | 610 | 8243 | 5076.15 | 94.10 | 93.50 | 88.80 | 95.00 | 90.00 |
2014 | 619 | 8078 | 4929.31 | 92.20 | 92.00 | 89.60 | 90.90 | 90.20 |
2015 | 619 | 7410 | 4519.98 | 84.60 | 86.20 | 88.90 | 83.40 | 88.90 |
2016 | 619 | 8584 | 5259.45 | 97.70 | 99.80 | 90.70 | 96.70 | 90.20 |
2017 | 619 | 7804 | 4768.41 | 89.10 | 88.00 | 90.30 | 87.90 | 89.90 |
2018 | 619 | 7756 | 4767.33 | 88.50 | 87.90 | 90.00 | 87.90 | 89.60 |
2019 | 619 | 8664 | 5341.24 | 98.90 | 98.80 | 91.00 | 98.50 | 90.60 |
2020 | 619 | 7870 | 4753.88 | 89.60 | 90.00 | 90.90 | 87.40 | 90.30 |
2021 | 619 | 7768 | 4788.17 | 88.70 | 88.20 | 90.60 | 88.30 | 90.10 |
2022 | 619 | 8760 | 5468.09 | 100.00 | 99.70 | 91.40 | 100.80 | 91.00 |