Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CPR-1000 |
Owner | Fujian Ningde Nuclear Power Company, Ltd. |
Operator | Fujian Ningde Nuclear Power Company, Ltd. |
Timeline
Construction Start | Friday, 8 January 2010 |
---|---|
First Criticality | Sunday, 8 March 2015 |
First Grid Connection | Saturday, 21 March 2015 |
Commercial Operation | Wednesday, 10 June 2015 |
Specifications
Capacity Net | 1018 MWe |
---|---|
Capacity Gross | 1089 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1018 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2015 | 1018 | 5586 | 4638.75 | 92.80 | 91.20 | 91.20 | 80.90 | 80.90 |
2016 | 1018 | 6514 | 6086.41 | 74.20 | 81.40 | 85.00 | 68.10 | 72.80 |
2017 | 1018 | 8107 | 7971.03 | 92.60 | 95.60 | 89.10 | 89.40 | 79.20 |
2018 | 1018 | 8141 | 8264.16 | 92.90 | 92.40 | 90.00 | 92.70 | 83.00 |
2019 | 1018 | 8075 | 8167.27 | 92.20 | 91.60 | 90.40 | 91.60 | 84.80 |
2020 | 1018 | 8501 | 8650.70 | 96.80 | 96.70 | 91.50 | 96.70 | 87.00 |
2021 | 1018 | 8271 | 8418.61 | 94.40 | 94.40 | 92.00 | 94.40 | 88.10 |
2022 | 1018 | 8094 | 8239.00 | 92.40 | 92.40 | 92.00 | 92.40 | 88.70 |