Details

Reactor Type Pressurised Water Reactor (or PWR)
Model CPR-1000
Owner Fujian Ningde Nuclear Power Company, Ltd.
Operator Fujian Ningde Nuclear Power Company, Ltd.

Timeline

Construction Start Friday, 8 January 2010
First Criticality Sunday, 8 March 2015
First Grid Connection Saturday, 21 March 2015
Commercial Operation Wednesday, 10 June 2015

Specifications

Capacity Net 1018 MWe
Capacity Gross 1089 MWe
Thermal Capacity 2905 MWt
Design Net Capacity 1018 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2015 1018 5586 4638.75 92.80 91.20 91.20 80.90 80.90
2016 1018 6514 6086.41 74.20 81.40 85.00 68.10 72.80
2017 1018 8107 7971.03 92.60 95.60 89.10 89.40 79.20
2018 1018 8141 8264.16 92.90 92.40 90.00 92.70 83.00
2019 1018 8075 8167.27 92.20 91.60 90.40 91.60 84.80
2020 1018 8501 8650.70 96.80 96.70 91.50 96.70 87.00
2021 1018 8271 8418.61 94.40 94.40 92.00 94.40 88.10
2022 1018 8094 8239.00 92.40 92.40 92.00 92.40 88.70

Source: Operating details - IAEA PRIS