Details

Reactor Type Pressurised Water Reactor (or PWR)
Model ACPR-1000
Owner Liaoning Hongyanhe Nuclear Power Co Ltd
Operator Liaoning Hongyanhe Nuclear Power Co Ltd

Timeline

Construction Start Sunday, 29 March 2015
First Criticality Sunday, 13 June 2021
First Grid Connection Friday, 25 June 2021
Commercial Operation Saturday, 31 July 2021

Specifications

Capacity Net 1061 MWe
Capacity Gross 1119 MWe
Thermal Capacity 2905 MWt
Design Net Capacity 1061 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2021 1061 4560 4718.48 100.00 97.70 97.70 96.90 96.90
2022 1061 6490 6217.30 74.10 87.30 90.40 66.90 75.80

Source: Operating details - IAEA PRIS