Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | ACPR-1000 |
Owner | Liaoning Hongyanhe Nuclear Power Co Ltd |
Operator | Liaoning Hongyanhe Nuclear Power Co Ltd |
Timeline
Construction Start | Sunday, 29 March 2015 |
---|---|
First Criticality | Sunday, 13 June 2021 |
First Grid Connection | Friday, 25 June 2021 |
Commercial Operation | Saturday, 31 July 2021 |
Specifications
Capacity Net | 1061 MWe |
---|---|
Capacity Gross | 1119 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1061 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2021 | 1061 | 4560 | 4718.48 | 100.00 | 97.70 | 97.70 | 96.90 | 96.90 |
2022 | 1061 | 6490 | 6217.30 | 74.10 | 87.30 | 90.40 | 66.90 | 75.80 |