Details

Reactor Type Pressurised Water Reactor (or PWR)
Model CPR-1000
Owner Liaoning Hongyanhe Nuclear Power Co Ltd
Operator Liaoning Hongyanhe Nuclear Power Co Ltd

Timeline

Construction Start Saturday, 15 August 2009
First Criticality Saturday, 5 March 2016
First Grid Connection Friday, 1 April 2016
Commercial Operation Wednesday, 8 June 2016

Specifications

Capacity Net 1061 MWe
Capacity Gross 1119 MWe
Thermal Capacity 2905 MWt
Design Net Capacity 1061 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
2016 1000 1200 1130.44 54.40 100.00 100.00 51.20 51.20
2017 1061 3638 3276.06 41.50 85.10 90.40 35.20 30.50
2018 1061 5361 5198.53 61.20 84.10 87.90 55.90 40.50
2019 1061 7035 7117.14 80.30 90.40 88.60 76.60 50.60
2020 1061 8183 7755.39 93.20 91.30 89.20 83.20 57.80
2021 1061 8177 8327.55 93.30 91.20 89.60 89.60 63.50
2022 1061 8076 8000.10 92.20 89.50 89.60 86.10 67.00

Source: Operating details - IAEA PRIS