Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | AP1000 |
Owner | China Power Investment Group |
Operator | Shandong Nuclear Power Company, Ltd. |
Timeline
Construction Start | Thursday, 24 September 2009 |
---|---|
First Criticality | Wednesday, 8 August 2018 |
First Grid Connection | Friday, 17 August 2018 |
Commercial Operation | Monday, 22 October 2018 |
Specifications
Capacity Net | 1170 MWe |
---|---|
Capacity Gross | 1250 MWe |
Thermal Capacity | 3415 MWt |
Design Net Capacity | 1126 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2018 | 1170 | 2870 | 2746.03 | 95.30 | 94.20 | 94.20 | 93.90 | 93.90 |
2019 | 1170 | 8221 | 9456.75 | 93.80 | 96.50 | 96.10 | 92.30 | 92.50 |
2020 | 1170 | 7701 | 8762.30 | 87.70 | 85.70 | 91.30 | 85.30 | 89.20 |
2021 | 1170 | 8030 | 9133.85 | 91.70 | 91.80 | 91.40 | 89.10 | 89.10 |
2022 | 1170 | 8409 | 9520.82 | 96.00 | 94.60 | 92.20 | 92.90 | 90.00 |