Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | Hualong One |
Owner | Cnnc Fujian Fuqing Nuclear Power Co., Ltd |
Operator | CNNC Fujian Fuqing Nuclear Power Co Ltd |
Timeline
Construction Start | Thursday, 7 May 2015 |
---|---|
First Criticality | Wednesday, 21 October 2020 |
First Grid Connection | Friday, 27 November 2020 |
Commercial Operation | Saturday, 30 January 2021 |
Specifications
Capacity Net | 1075 MWe |
---|---|
Capacity Gross | 1161 MWe |
Thermal Capacity | 3050 MWt |
Design Net Capacity | 1075 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2020 | 1000 | 312 | 91.72 | - | - | - | - | - |
2021 | 1075 | 7965 | 8461.95 | 90.10 | 91.50 | 91.50 | 89.00 | 89.00 |
2022 | 1075 | 6441 | 6721.77 | 73.50 | 74.90 | 82.80 | 71.40 | 79.80 |