Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CPR-1000 |
Owner | Cnnc Fujian Fuqing Nuclear Power Co., Ltd |
Operator | CNNC Fujian Fuqing Nuclear Power Co Ltd |
Timeline
Construction Start | Friday, 31 December 2010 |
---|---|
First Criticality | Sunday, 3 July 2016 |
First Grid Connection | Wednesday, 7 September 2016 |
Commercial Operation | Monday, 24 October 2016 |
Specifications
Capacity Net | 1000 MWe |
---|---|
Capacity Gross | 1089 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2016 | 1000 | 1648 | 1628.31 | 100.00 | 100.00 | 100.00 | 98.60 | 98.60 |
2017 | 1000 | 6592 | 6110.93 | 75.20 | 82.10 | 84.70 | 69.80 | 73.90 |
2018 | 1000 | 7357 | 7013.40 | 84.00 | 88.70 | 86.50 | 80.10 | 76.70 |
2019 | 1000 | 8107 | 7390.94 | 92.60 | 95.20 | 89.30 | 84.40 | 79.20 |
2020 | 1000 | 7724 | 7265.42 | 87.90 | 88.60 | 89.10 | 82.70 | 80.00 |
2021 | 1000 | 7835 | 7184.22 | 89.40 | 91.00 | 89.50 | 82.00 | 80.40 |
2022 | 1000 | 8369 | 8011.27 | 95.50 | 99.20 | 91.00 | 91.40 | 82.20 |