Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CPR-1000 |
Owner | Qinshan Nuclear Power Company |
Operator | Cnnc Nuclear Operation Management Company Limited |
Timeline
Construction Start | Friday, 17 July 2009 |
---|---|
First Criticality | Thursday, 25 December 2014 |
First Grid Connection | Monday, 12 January 2015 |
Commercial Operation | Thursday, 12 February 2015 |
Specifications
Capacity Net | 1012 MWe |
---|---|
Capacity Gross | 1089 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2015 | 1012 | 7747 | 7400.55 | 92.90 | 93.20 | 93.20 | 90.00 | 90.00 |
2016 | 1012 | 7529 | 7324.84 | 85.70 | 87.30 | 90.10 | 82.40 | 86.00 |
2017 | 1012 | 7563 | 7521.75 | 86.30 | 85.00 | 88.40 | 84.80 | 85.60 |
2018 | 1012 | 8483 | 8472.42 | 96.80 | 97.60 | 90.70 | 95.60 | 88.20 |
2019 | 1012 | 7963 | 7965.85 | 90.90 | 91.00 | 90.80 | 89.90 | 88.50 |
2020 | 1012 | 8376 | 8418.73 | 95.40 | 99.60 | 92.30 | 94.70 | 89.60 |
2021 | 1012 | 7704 | 7663.47 | 88.00 | 85.80 | 91.30 | 86.40 | 89.10 |
2022 | 1012 | 8219 | 8301.13 | 93.80 | 92.20 | 91.40 | 93.60 | 89.70 |