Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CPR-1000 |
Owner | Qinshan Nuclear Power Company |
Operator | Cnnc Nuclear Operation Management Company Limited |
Timeline
Construction Start | Friday, 26 December 2008 |
---|---|
First Criticality | Tuesday, 21 October 2014 |
First Grid Connection | Tuesday, 4 November 2014 |
Commercial Operation | Monday, 15 December 2014 |
Specifications
Capacity Net | 1012 MWe |
---|---|
Capacity Gross | 1089 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2014 | 1000 | 0 | 0.00 | 0.00 | 100.00 | 100.00 | 0.00 | - |
2015 | 1012 | 7289 | 7180.23 | 83.20 | 84.50 | 85.70 | 81.00 | 74.70 |
2016 | 1012 | 7910 | 7827.38 | 90.00 | 91.70 | 88.60 | 88.00 | 81.10 |
2017 | 1012 | 7676 | 7628.57 | 87.60 | 88.50 | 88.60 | 86.00 | 82.70 |
2018 | 1012 | 8732 | 8761.17 | 99.70 | 99.10 | 91.10 | 98.80 | 86.70 |
2019 | 1012 | 8048 | 7992.84 | 91.90 | 89.80 | 90.90 | 90.20 | 87.40 |
2020 | 1012 | 7218 | 7214.92 | 82.20 | 89.30 | 90.60 | 81.20 | 86.30 |
2021 | 1012 | 8760 | 8862.47 | 100.00 | 99.80 | 91.90 | 100.00 | 88.30 |
2022 | 1012 | 8150 | 8212.68 | 93.00 | 91.60 | 91.90 | 92.60 | 88.80 |