Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CPR-1000 |
Owner | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
Operator | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
Timeline
Construction Start | Friday, 30 July 2010 |
---|---|
First Criticality | Tuesday, 13 October 2015 |
First Grid Connection | Sunday, 25 October 2015 |
Commercial Operation | Friday, 1 January 2016 |
Specifications
Capacity Net | 1000 MWe |
---|---|
Capacity Gross | 1086 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2015 | 1000 | 1034 | 660.80 | - | - | - | - | - |
2016 | 1000 | 7761 | 7141.83 | 88.40 | 100.00 | 100.00 | 81.30 | 81.30 |
2017 | 1000 | 5794 | 5212.98 | 66.10 | 76.70 | 88.30 | 59.50 | 70.40 |
2018 | 1000 | 7622 | 7425.87 | 87.00 | 90.00 | 88.90 | 84.80 | 75.20 |
2019 | 1000 | 8736 | 8540.31 | 99.70 | 99.60 | 91.60 | 97.50 | 80.80 |
2020 | 1000 | 8140 | 7919.20 | 92.70 | 91.40 | 91.50 | 90.20 | 82.60 |
2021 | 1000 | 8179 | 8168.79 | 93.40 | 92.90 | 91.80 | 93.20 | 84.40 |
2022 | 1000 | 8499 | 8414.60 | 97.00 | 99.20 | 92.80 | 96.10 | 86.10 |