Details

Reactor Type Pressurised Water Reactor (or PWR)
Model VVER-1200/V-529
Owner Nuclear Power Plants Authority of Egypt
Operator Nuclear Power Plants Authority

Timeline

Construction Start Wednesday, 20 July 2022

Specifications

Capacity Net 1100 MWe
Capacity Gross 1200 MWe
Thermal Capacity 3212 MWt
Design Net Capacity 1100 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)

Source: Operating details - IAEA PRIS


See Also

Nuclear Power in Egypt

Related News

WNN articles on Egypt
Subscribe to receive updates on news