Details

Reactor Type Pressurized Heavy Water Reactor (or PHWR)
Model CANDU 200
Owner AECL
Operator Ontario Hydro

Timeline

Construction Start Monday, 1 February 1960
First Criticality Tuesday, 15 November 1966
First Grid Connection Saturday, 7 January 1967
Commercial Operation Thursday, 26 September 1968
Permanent Shutdown Friday, 4 May 1984

Specifications

Capacity Net 206 MWe
Capacity Gross 218 MWe
Thermal Capacity 704 MWt
Design Net Capacity 203 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
1967 - - - - - - - -
1968 - - - - - - - -
1969 - - - - - - - -
1970 220 5155 916.00 59.00 47.70 - 47.70 -
1971 220 5345 1044.50 61.20 54.30 51.00 54.40 51.00
1972 220 1796 356.50 20.50 20.80 40.90 18.50 40.20
1973 208 5672 1048.10 63.70 62.90 46.20 56.60 44.10
1974 207 6992 1129.60 80.00 62.50 49.40 62.50 47.70
1975 206 6702 1284.30 76.70 71.40 52.90 71.40 51.50
1976 206 5543 1089.50 63.30 60.70 54.00 60.40 52.70
1977 206 5713 772.00 65.40 45.90 53.00 42.90 51.50
1978 206 6712 855.20 76.80 49.20 52.60 47.50 51.10
1979 206 8161 1063.90 92.20 66.80 54.00 58.30 51.80
1980 130 2436 310.50 27.70 27.10 52.40 27.20 50.40
1981 206 7981 1109.40 91.10 94.10 55.90 61.50 51.30
1982 206 6703 1343.00 76.50 74.70 57.40 74.40 53.10
1983 206 6860 1401.20 78.30 77.70 58.90 77.60 54.90
1984 206 2664 538.97 88.60 87.10 59.50 86.90 55.60

Source: Operating details - IAEA PRIS