Details
Reactor Type | Light Water Graphite Reactor (or LWGR) |
---|---|
Model | RBMK |
Owner | Se “Nnegc “Energoatom” |
Operator | Mintopenergo Of Ukraine - Ministry Of Fuel And Energy Of Ukraine |
Timeline
Construction Start | Sunday, 1 April 1979 |
---|---|
First Criticality | Saturday, 26 November 1983 |
First Grid Connection | Thursday, 22 December 1983 |
Commercial Operation | Monday, 26 March 1984 |
Permanent Shutdown | Saturday, 26 April 1986 |
Specifications
Capacity Net | 925 MWe |
---|---|
Capacity Gross | 1000 MWe |
Thermal Capacity | 3200 MWt |
Design Net Capacity | 925 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
1983 | - | - | - | - | - | - | - | - |
1984 | - | - | - | - | - | - | - | - |
1985 | - | - | - | - | - | - | - | - |
1986 | - | - | - | - | - | - | - | - |