Details

Reactor Type Light Water Graphite Reactor (or LWGR)
Model RBMK
Owner Se “Nnegc “Energoatom”
Operator Mintopenergo Of Ukraine - Ministry Of Fuel And Energy Of Ukraine

Timeline

Construction Start Sunday, 1 April 1979
First Criticality Saturday, 26 November 1983
First Grid Connection Thursday, 22 December 1983
Commercial Operation Monday, 26 March 1984
Permanent Shutdown Saturday, 26 April 1986

Specifications

Capacity Net 925 MWe
Capacity Gross 1000 MWe
Thermal Capacity 3200 MWt
Design Net Capacity 925 MWe

Operational History

Electricity Supplied (GWh)

Energy Availability Factor (%)

Total Electricity Supplied (GWh)

Reactor History

Year Reference Unit Power (MWe) Annual Time Online (Hours) Electricity Supplied (GWh) Operation Factor (%) Energy Availability Annual (%) Energy Availability Cumulative (%) Load Factor Annual (%) Load Factor Cumulative (%)
1983 - - - - - - - -
1984 - - - - - - - -
1985 - - - - - - - -
1986 - - - - - - - -