Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | APR-1400 |
Owner | Emirates Nuclear Energy Corporation |
Operator | Nawah Energy Company |
Timeline
Construction Start | Thursday, 19 July 2012 |
---|---|
First Criticality | Friday, 7 August 2020 |
First Grid Connection | Wednesday, 19 August 2020 |
Commercial Operation | Thursday, 1 April 2021 |
Specifications
Capacity Net | 1337 MWe |
---|---|
Capacity Gross | 1417 MWe |
Thermal Capacity | 3983 MWt |
Design Net Capacity | 1310 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2020 | 1345 | 2645 | 1561.81 | - | - | - | - | - |
2021 | 1417 | 6763 | 8926.09 | 91.80 | 85.40 | 85.40 | 85.50 | 85.50 |
2022 | 1337 | 6269 | 8196.79 | 71.60 | 69.90 | 76.80 | 70.00 | 76.90 |