Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CPR-1000 |
Owner | Yangjiang Nuclear Power Company |
Operator | Yangjiang Nuclear Power Company |
Timeline
Construction Start | Monday, 15 November 2010 |
---|---|
First Criticality | Sunday, 11 October 2015 |
First Grid Connection | Sunday, 18 October 2015 |
Commercial Operation | Friday, 1 January 2016 |
Specifications
Capacity Net | 1000 MWe |
---|---|
Capacity Gross | 1086 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2015 | 1000 | 890 | 478.68 | - | - | - | - | - |
2016 | 1000 | 7559 | 7593.85 | 86.00 | 91.10 | 91.10 | 86.40 | 86.40 |
2017 | 1000 | 7435 | 7396.07 | 84.90 | 86.10 | 88.60 | 84.40 | 85.40 |
2018 | 1000 | 8028 | 7926.66 | 91.60 | 91.10 | 89.40 | 90.50 | 87.10 |
2019 | 1000 | 8760 | 8621.67 | 100.00 | 100.00 | 92.10 | 98.40 | 89.90 |
2020 | 1000 | 7039 | 6600.21 | 80.10 | 86.80 | 91.00 | 75.10 | 87.00 |
2021 | 1000 | 7978 | 7804.98 | 91.10 | 93.40 | 91.40 | 89.10 | 87.30 |
2022 | 1000 | 8760 | 8991.99 | 100.00 | 100.00 | 92.60 | 102.60 | 89.50 |