Details
Reactor Type | Pressurised Water Reactor (or PWR) |
---|---|
Model | CPR-1000 |
Owner | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
Operator | Guangxi Fangchenggang Nuclear Power Company, Ltd. |
Timeline
Construction Start | Thursday, 23 December 2010 |
---|---|
First Criticality | Wednesday, 29 June 2016 |
First Grid Connection | Friday, 15 July 2016 |
Commercial Operation | Saturday, 1 October 2016 |
Specifications
Capacity Net | 1000 MWe |
---|---|
Capacity Gross | 1086 MWe |
Thermal Capacity | 2905 MWt |
Design Net Capacity | 1000 MWe |
Operational History
Electricity Supplied (GWh)
Energy Availability Factor (%)
Total Electricity Supplied (GWh)
Reactor History
Year | Reference Unit Power (MWe) | Annual Time Online (Hours) | Electricity Supplied (GWh) | Operation Factor (%) | Energy Availability Annual (%) | Energy Availability Cumulative (%) | Load Factor Annual (%) | Load Factor Cumulative (%) |
---|---|---|---|---|---|---|---|---|
2016 | 1000 | 3297 | 2648.30 | 88.20 | 100.00 | 100.00 | 91.10 | 91.10 |
2017 | 1000 | 6827 | 6569.07 | 77.90 | 80.30 | 84.20 | 75.00 | 78.20 |
2018 | 1000 | 7816 | 7655.73 | 89.20 | 99.80 | 91.20 | 87.40 | 82.30 |
2019 | 1000 | 7625 | 7579.32 | 87.00 | 92.10 | 91.50 | 86.50 | 83.60 |
2020 | 1000 | 7911 | 7901.00 | 90.10 | 92.00 | 91.60 | 90.00 | 85.10 |
2021 | 1000 | 8760 | 8888.26 | 100.00 | 100.00 | 93.20 | 101.50 | 88.20 |
2022 | 1000 | 8129 | 8168.69 | 92.80 | 93.00 | 93.20 | 93.20 | 89.00 |